PROBLEM: Break down the groundwater by about 4 meters for the construction of the underground floors of a residential housing complex in an extremely impervious terrain and with heterogeneous stratifications.
SOLUTION: installation of a wellpoint system with prefilter around the perimeters of the excavations
RESULT: lowering of the groundwater to the required depth without impediments