Our client needed to build a new hydroelectric power station on the Agogna river with only partial protection of the excavation by Larssen sheet piling. Considering the lithographic situation, we proceeded with a perimeter wellpoint system for the excavation that would dry and consolidate the soil, which was liquid and impossible to handle.
Details
Application: Hydroelectric power plant construction
Province: Pavia
Type of pumps: self-priming electric pumps + self-priming motor pumps
No. of pumps: 5